

 |
Watch Our
Talking Brochure™ |

SBCRI is very careful to maintain the confidentiality of our clients' proprietary information and testing. SBCRI's doors are locked at all times. Qualtim staff must get clearance from Qualtim's President, Vice President or Director of R&D and Industry Projects before entering or taking any visitors into the SBCRI testing facility. |
|
 |
 |
| Roadmap to Code Compliance |
| / / / It's Less Complicated Than It Seems / / / |

| Roadmap to Code Compliance |
|
| Building Official’s Alternative Product Code Compliance Checklist |
PDF |
| Customized TER for Your Alternative Product, Design or Method of Construction |
|
Building Official Approval of the Use of Alternative Materials, Designs & Methods of Construction (TER No. 1101-02.1) |
PDF |
TER Code Compliance Evaluations (TER No. 1101-02.2) |
PDF |
SBCRI is an Approved Agency & SBCRI/Qualtim an Approved Source (TER No. 1101-02.3) |
PDF |
Acceptance Criteria (e.g. AC-369, etc.) Are Not Consensus Standards and Therefore Are Not Relevant for Code Compliance (TER No. 1101-02.4) |
PDF |
ICC-ES Evaluation Reports Assist Those Enforcing Model Codes; Approval is the Prerogative & Responsibility of the Code Official (TER No. 1101-02.5) |
PDF |
Requirements for Acceptance & Approval of Sealed Engineered Designs for Products & Services (TER No. 1101-02.6) |
PDF |
Download the Product Approval Submittal Package.
Steps for Submitting an Alternative Product, Design or Method of Construction |
Here are the steps for submitting an alternative product, design or method of construction using the SBCRI/Qualtim Product Submittal Package:
- Submitted construction documents propose use of an alternative product.
- An attached SBCRI/Qualtim Product Submittal Package documents that the proposed design is satisfactory and complies with the intent of, and is at least equivalent to the purpose intended by, the provisions of the code.
- The SBCRI/Qualtim Product Submittal Package includes a Technical Evaluation Report (TER), which provides a code-compliance evaluation for this product and application.
- The Building Official reviews the construction documents, and the alternative product application conforms to the provisions of the building code, relevant laws, ordinances, rules, and regulations.
- If the Building Official finds that the alternative product application does not conform to the provisions of the code, he/she shall state in writing the code section that has been violated.
- The applicant corrects the product and/or application to meet the intent of the code and resubmits the application to the Building Official.
- The alternative product is approved and the permit is issued.
|
|
|